ตัวกรองผลการค้นหา
determine
แปลว่ากำหนด, วัด, กะเกณฑ์
Award upon Settlement
แปลว่าคำตัดสินเมื่อได้ตกลงปรองดองกันแล้ว ใช้ในกรณีที่สามารถปรองดองกันได้ก่อนอนุญาโตตุลาการจะตัดสิน เมื่อปรองดองกันได้อนุญาโตตุลาการก็จะตัดสินตามที่ได้ตกลงปรองดองกัน
Vicat Apparatus
แปลว่า(Concrete Engineering) A penetration device used to determine the setting characteristics of hydraulic cements.
Ac3
แปลว่า(english) In hypoeutectoid steel, the temperature at which transformation of ferrite into austenite is completed upon heating.
Elastic:
แปลว่า(english) A material or structure is said to behave elastically if it returns to its original geometry upon unloading.
Vapor Pressure
แปลว่า(Concrete Engineering) The pressure exerted by a vapor that is calculated based upon relative humidity and temperature. The higher the humidity and higher temperature, in degrees Fahrenheit, the greater the vapor pressure exerted.
Rotation:
แปลว่า(english) Motion of an object where the path of every point is a circle or circular arc. A rotation is defined by a point and vector which determine the axis of rotation. The direction of the vector is the direction of the axis and the magnitude of the vector is the angle of rotation.
Construction Joint
แปลว่า(Concrete Engineering) The contact between the placed concrete and concrete surfaces, against or upon which concrete is to be placed and to which new concrete is to adhere, that has become so rigid that the new concrete cannot be incorporated integrally by vibration with that previously placed. Unformed construction joints are horizontally placed or nearly so.
Hydrologic Cycle
แปลว่า(Concrete Engineering) The Hydrologic Cycle consists of the evaporation of water from oceans and other bodies of open water; condensation to produce cloud formations; precipitation of rain, snow, sleet or hail upon land surfaces; dissipation of rain or melted solids by direct run-off into lakes and by seepage into the soil. Thereby producing a continuing endless source of water in the sub-grade.
Agglomerating Processes
แปลว่า(english) "Fine particles of limestone (flux) and iron ore are difficult to handle and transport because of dusting and decomposition, so the powdery material usually is processed into larger pieces. The raw material's properties determine the technique that is used by mills. 1) SINTER Baked particles that stick together in roughly one-inch chunks. Normally used for iron ore dust collected from the blast furnaces. 2) PELLETS Iron ore or limestone particles are rolled into little balls in a balling drum and hardened by heat. 3) BRIQUETTES Small lumps are formed by pressing material together. Hot Iron Briquetting (HBI) is a concentrated iron ore substitute for scrap for use in electric furnaces.
Water Vapor Pressure
แปลว่า(Concrete Engineering) The pressure exerted by water vapor. Air that contains higher amounts of water vapor exerts a higher vapor pressure than air which has a lower amount of has a higher water vapor pressure In concrete water vapor pressure is calculated by the difference between the vapor pressure of the concrete and the ambient relative humidity and temperature and in contact with the soil. that is calculated by; based upon relative humidity and temperature. The greater the difference between the water vapor and ambient humidity and temperature, in degrees Fahrenheit. the greater the water vapor pressure exerted.