ค้นเจอ 9 รายการ

 หรือคุณกำลังค้นหา Black Plate, Cold Joint, Blanking, Bridling, Primary treatment, Breaker, Beam and Sling

Primary treatment

แปลว่า(Environmental Engineering) Treatment which includes all operation prior to and including primary treatment, e.g., bar screening, grit removal, comminution, and primary sedimentation.

Waste minimization

แปลว่า(Environmental Engineering) The elimination or reduction of a waste prior to its generation. This is accomplished by process changes rather than waste treatment methods.

Breaker

แปลว่า(english) Uncoiler rolls through which the strip passes; composed of a mandrel and leveling rolls which unwind the strip prior to processing through the Pickler. Breaker rolls assist in breaking up the Hot Mill surface scale.

Beam and Sling

แปลว่า(english) Tackle used in conjunction with a crane for turning over the cope or drag of a mold prior to assembly.

Cold Joint

แปลว่า(Concrete Engineering) A visible lineation which forms when the placement of concrete is delayed. The concrete in place hardens prior to the next placement of concrete against it.

Black Plate

แปลว่า(english) A light weight or a thin uncoated steel sheet or strip so called because of its dark oxide coloring prior to pickling. It is manufactured by two different processes. (1) Form sheet bar on single stand sheet mills or sheet mills in tandem. This method is now almost obsolete. (2) On modern, high speed continuous tandem cold reduction mills from coiled hot rolled pickled wide strip into ribbon wound coils to finished gage. Sizes range from 12 to 32 in width, and in thicknesses from 55 lbs. to 275 lbs. base box weight. It is used either as is for stampings, or may be enameled or painted or tin or terne coated.

AAC - Autoclaved Aerated Concrete

แปลว่า(Concrete Engineering) Exceptionally lightweight precast concrete with high thermal qualities and fire resistence. Suitable for cutting with ordinary hand tools. Mix design is composed of portland cement, sand or siliceous material, lime, gypsum, finely powdered aluminum, and water. Initial mix is a combination of portland cement, sand, lime and gypsum to produce a slurry. Finely powdered aluminum mixed into a paste is added prior to placement into large, rail-like forms. The finely powdered aluminum reacts with the alkaline components of the cement and lime to produce hydrogen gas, which increases the volume approximately five times producing a uniformly, dispersed cellular structure. Units are cut to required shape. Units are placed in an autoclave, an enclosed pressurized chamber, and steam cured at 3500 F. Approximately 80% of the ultimate volume consists of air voids.

Bridling

แปลว่า(english) The cold working of dead soft annealed strip metal immediately prior to a forming, bending, or drawing operation. A process designed to prevent the formulation of Luder's lines. Caution-Bridled metal should be used promptly and not permitted to (of itself) return to its pre-bridled condition.

Blanking

แปลว่า(english) An early step in preparing flat-rolled steel for use by an end user. A blank is a section of sheet that has the same outer dimensions as a specified part (such as a car door or hood) but that has not yet been stamped. Steel processors may offer blanking for their customers to reduce their labor and transportation costs; excess steel can be trimmed prior to shipment.

 ศัพท์ช่างภาษาอังกฤษ – ไทย จัดกลุ่มตามตัวอักษร A-Z